Achieving the ability to grow within the same space and reduce both cycle times and delivery lead times were some of Hamilton Associates strategic objectives. With the guidance of the WM Synergy’s Lean team, we accomplished the following through Kaizen:
- Freed up 45% of our occupied space from 1724 sq ft being utilized to 942 sq. ft.
- Quoted Service Lead-Time reduced from 10 days to 2 days (or less)!
- Cycle Time reduction from 143.5 minutes to 78 minutes a 45% reduction.
Douglas Hamilton, III, CEO
Hamilton Associates, Inc.